PNG Conducting Preventative Maintenance on existing domestic pipeline between Burns Lake & Terrace

PNG is conducting preventative maintenance Integrity Digs on their existing domestic pipeline between Burns Lake and Terrace.

The work being performed is to ensure the safety and integrity of the line.

The attached link outlines the scope, a map, planned work and their schedule.

/files/PNG_2021_Integrity_Digs.pdf